Concordia GM Building
Début de construction: March 2011
Fin de construction: May 2012
Final rendering:
![]()
Dernière modification par Alexcaban ; 04/04/2012 à 23h50.
C'est quoi Malek ce rendu?
c'est le building laid sur Maisonneuve qui à l'air d'avoir eu un face lift.
le building audessus du métro guy sortie guy
![]()
I order the club sandwich all the time, but I'm not even a member, man. I don't know how I get away with it.
I was going to have my teeth whitened, but then I said "Fuck that, I'll just get a tan instead- Mitch Hedberg
c'est sérieux ce projet?
That building right now is currently the JSMB. Once the new JMSB opens up (hopefully in January) and give everyone the chance to move everything from one building to the other , than they will start on the face lift for that one. If they start it next summer, that would be pretty good.
The JMSB building is set to open in the fall.
Also, has anyone else seen the new street lights along de Maisonneuve between Peel and Guy. They replaced the old sodium lights, orange, with LEDs, white light. The new post also have a light over the sidewalk in addition to the usual one over the street, makes for a nice effect at night.
Yeah, I heard they were planning on putting all of Concordia's administration into the Guy Metro building, which would be renovated.
Will the new JMSB be connected to the Guy Metro? Are there any plans to connect the Hall/Library buildings to the Metro as well?
The Faubourg is a weird place to have class, the basement resembles an old movie theater... The LS building (2015 Drummond) is neat place to have class as well, kind of Art-Deco inside.
Liens sociaux